Changes

Jump to navigation Jump to search
m
Line 56: Line 56:

==Sub-surface components==
==Sub-surface components==
Most LID practices use a combination of sub-surface features such as gravel storage reservoirs, liners, underdrains, monitoring wells, and other components to meet their design objectives. The construction process for sub-surface components works from the ground up. While some LID practices include all the sub-surface components listed below, most designs will not include one or more of these layers or components. [[Permeable pavements]] can have different construction requirements at this stage, mostly regarding compaction of sub-surface layers. '''Installing [[infiltration chambers]] also requires guidance specific to that LID type.''' 
Most LID practices use a combination of sub-surface features such as gravel storage reservoirs, liners, underdrains, monitoring wells, and other components to meet their design objectives. The construction process for sub-surface components works from the ground up. While some LID practices include all the sub-surface components listed below, most designs will not include one or more of these layers or components. [[Permeable pavements]] can have different construction requirements at this stage, mostly regarding compaction of sub-surface layers. Installing [[infiltration chambers]] also requires guidance specific to that LID type.  


The [[sub-surface components]] page gives guidance on:  
The [[sub-surface components]] page gives guidance on:  
Line 68: Line 68:
**sub-base reservoir (permeable pavements)
**sub-base reservoir (permeable pavements)
**base course (permeable pavements)
**base course (permeable pavements)
**'''infiltration chamber installation'''
**infiltration chamber installation
*stone choker layer
*stone choker layer
*curbing
*curbing
722

edits

Navigation menu