Line 1: |
Line 1: |
| [[File:20150618 114542.jpg|thumb|350px|right|Improper elevation at the curb cut, impeding the inflow to enter the LID facility (bioretention) (Photo source: CVC)]] | | [[File:20150618 114542.jpg|thumb|350px|right|Improper elevation at the curb cut, impeding the inflow to enter the LID facility (bioretention) (Photo source: CVC, '''year''')]] |
|
| |
|
| "'INSERT VIDEO FROM HAGGERT AVE: \\Hqcvcfs01\cvc2\Watershed Management\Integrated Water Management Implementation\Fletchers Creek SNAP\Haggert Ave Road Retrofit\3 - Photos\Construction Photos\Site Visit_20201120\Riverstone Construction Haggert Ave Inlet_F.mp4'' | | "'INSERT VIDEO FROM HAGGERT AVE: \\Hqcvcfs01\cvc2\Watershed Management\Integrated Water Management Implementation\Fletchers Creek SNAP\Haggert Ave Road Retrofit\3 - Photos\Construction Photos\Site Visit_20201120\Riverstone Construction Haggert Ave Inlet_F.mp4'' |
Line 10: |
Line 10: |
| #Shape the inlet | | #Shape the inlet |
| #Add the river stone on top of the fresh concrete (if applicable) | | #Add the river stone on top of the fresh concrete (if applicable) |
| #Provide sufficient curing time, according to CSA standard A23.1-09. | | #Provide sufficient curing time, according to ([https://www.csagroup.org/store/product/2420232/#:~:text=and%20specialty%20concretes.-,A23.,A%20sister%20standard%20%E2%80%93%20CSA%20A23 CSA, 2009])<ref> CSA. 2009. A23.1-09/A23.2-09 (R2014). Concrete materials and methods of concrete construction/Test methods and standard practices for concrete. standard A23.1-09. https://www.csagroup.org/store/product/2420232/#:~:text=and%20specialty%20concretes.-,A23.,A%20sister%20standard%20%E2%80%93%20CSA%20A23 </ref> |
|
| |
|
| [[File:P1160129.JPG|thumb|400px|right|Ensure curb granular base (granular A) does not spill over into LID infiltration area. If material spills over, remove as best as possible while still maintaining the 2:1 slope for curbing. (Photo source: CVC)]] | | [[File:P1160129.JPG|thumb|400px|right|Ensure curb granular base (granular A) does not spill over into LID infiltration area. If material spills over, remove as best as possible while still maintaining the 2:1 slope for curbing. (Photo source: CVC, '''year''')]] |
| '''Key Inspection Points:''' | | '''Key Inspection Points:''' |
| *Use of proper curb form by sub-contractor. | | *Use of proper curb form by sub-contractor. |