Construction Tasks Table[edit]
Construction Stage | Construction Task | Permeable Interlocking Concrete Pavers | Porous Asphalt | Porous Concrete |
---|---|---|---|---|
Pre-Construction | Verification of Siting and LID Design | x | x | x |
Communication and Utilities Coordination | x | x | x | |
Installation of ESC and Construction Fencing | x | x | x | |
ESC Inspection and Maintenance (ongoing) | x | x | x | |
Excavation and Mass Grading |
Clearing and Grubbing | x | x | x |
Excavation | x | x | x | |
Subgrade | x | x | x | |
Verification of Grading/Survey* | x | x | x | |
Backfill Granular, Utilities and Pipes |
Geotextile (if applicable) | x | x | x |
Impermeable Liner (if applicable) | x | x | ||
Underdrain (if applicable) | x | x | ||
Overflow or Overflow Drain (if applicable) | x | x | x | |
Monitoring Well (if applicable) | x | x | ||
Sub-base Reservoir (if applicable) | x | x | x | |
Base Course | x | x | ||
Filter Layer (if applicable) | x | x | ||
Bedding layer | x | x | ||
Finishing Grades | Placement and Finishing | x | x | x |
Paver Installation | x | x | x | |
Tamping | x | x | x | |
Joint Cutting | x | x | x | |
Joint Aggregate | x | x | x | |
Curbing (if applicable) | x | x | ||
Stabilizing Contributing Drainage Area | x | x | ||
As-built Survey | x | x | ||
Post-Construction | Identify and Address Deficiencies | x | x | x |
Assumption/Certification Protocols | x | x | x |