User contributions
21 July 2022
Construction: storage reservoir
no edit summary
−8
Construction: storage reservoir
no edit summary
−4
Construction: storage reservoir
Created page with "''INSERT YOUTUBE LINK: https://www.youtube.com/watch?v=Ng_s2ErvPqk&t=58s <br>'' The storage reservoir layer holds and directs the stormwater into the underlying/native soils. The LID facilities, if applicable, should be filled with uniformly graded, washed stone (20 mm – 50 mm) that provides 30 to 40% void space. ‘’’Construction steps:’’’ #Backfill material from outside of the LID facility to avoid compaction and sediment entering the facilities. Use a s..."
20 July 2022
Bioretention: Construction
Backfill Granular and Pipes (SPC)
+668
Bioretention: Construction
Backfill Granular and Pipes (SPC)
+581
Bioretention: Construction
Backfill Granular and Pipes (SPC)
+276
Bioretention: Construction
Finishing Grades: Inlet, Outlet, Biomedia, Plants (SPC)
+18
Bioretention: Construction
Finishing Grades: Inlet, Outlet, Biomedia, Plants (SPC)
+457
Bioretention: Construction
Backfill Granular and Pipes (SPC)
+199
18 July 2022
Bioretention: Construction
Backfill Granular and Pipes (SPC)
+5
File:20150618 114542.jpg
no edit summary
Bioretention: Construction
Backfill Granular and Pipes (SPC)
+4
Bioretention: Construction
Backfill Granular and Pipes (SPC)
+220
Bioretention: Construction
Backfill Granular and Pipes (SPC)
+1,264
Riprap: Gallery
no edit summary
Bioretention: Construction
Finishing Grades: Inlet, Outlet, Biomedia, Plants (SPC)
+1,083
File:IMG 0897.JPG
no edit summary
File:IMG 0891.JPG
no edit summary
File:IMG 0788-1.JPG
no edit summary
File:IMG 0744.JPG
no edit summary
Bioretention: Construction
Backfill Granular and Pipes (SPC)
+943
Bioretention: Construction
Backfill Granular and Pipes (SPC)
+773
Bioretention: Construction
Finishing Grades: Inlet, Outlet, Biomedia, Plants (SPC)
+8
Bioretention: Construction
Finishing Grades: Inlet, Outlet, Biomedia, Plants (SPC)
+28
Riprap: Gallery
no edit summary
Riprap: Gallery
no edit summary
−27
Riprap: Gallery
Created page with "<gallery mode="packed" widths=200px heights=200px> Riprap directing the flow from the curb cut into a bioswale in Brampton, ON. Riprap directing the flow from the log flume into a rain garden at Belfountain P.S., Belfountain, ON. Riprap conveying the flow from the adjacent field into a rain garden at Janet I. McDougald P.S., Mississauga, ON. </gallery> Category:Gallery"
Bioretention: Construction
Finishing Grades: Inlet, Outlet, Biomedia, Plants (SPC)
+855
Bioretention: Construction
Finishing Grades: Inlet, Outlet, Biomedia, Plants (SPC)
+114
Bioretention: Construction
Finishing Grades: Inlet, Outlet, Biomedia, Plants (SPC)
−50
File:OLF Rain Garden.jpg
no edit summary
Bioretention: Construction
Finishing Grades: Inlet, Outlet, Biomedia, Plants (SPC)
−6
Bioretention: Construction
Finishing Grades: Inlet, Outlet, Biomedia, Plants (SPC)
+1
Bioretention: Construction
Finishing Grades: Inlet, Outlet, Biomedia, Plants (SPC)
+106
Bioretention: Construction
Finishing Grades: Inlet, Outlet, Biomedia, Plants (SPC)
+85
Bioretention: Construction
Finishing Grades: Inlet, Outlet, Biomedia, Plants (SPC)
−1
Bioretention: Construction
Finishing Grades: Inlet, Outlet, Biomedia, Plants (SPC)
+496
Bioretention: Construction
Finishing Grades: Inlet, Outlet, Biomedia, Plants (SPC)
+2
Bioretention: Construction
Finishing Grades: Inlet, Outlet, Biomedia, Plants (SPC)
+1,829
File:IMG 0852-1.JPG
no edit summary
File:IMG 0098-1.jpg
no edit summary
15 July 2022
14 July 2022
Bioretention: Construction
Finishing Grades: Inlet, Outlet, Biomedia, Plants (SPC)
+391
File:IMG 20210512 094405.jpg
no edit summary
File:Spot8 p2 20190820.JPG
no edit summary
File:ERI 2.jpg
no edit summary
File:Med FC SNAP Our Lady of Fatima Rain Garden planting 20220603 (56).JPG
no edit summary
File:IMG 1580.JPG
no edit summary