Difference between revisions of "Rainwater harvesting: Sizing and modeling"

From LID SWM Planning and Design Guide
Jump to navigation Jump to search
Line 42: Line 42:
----
----
===External Links===
===External Links===
<ul>
<li>*[https://www.epa.gov/water-research/storm-water-management-model-swmm SWMM5.1] </li>
</ul>
----
----
<table class="table table-hover table-condensed table-bordered">
<table class="table table-hover table-condensed table-bordered">
<td class="text-center"><i class="fa fa-envelope-open-o"></i>&nbsp;&nbsp;[[Special:SpecialContact|<strong>SEND US YOUR QUESTIONS & FEEDBACK ABOUT THIS PAGE</strong>]]</td>
<td class="text-center"><i class="fa fa-envelope-open-o"></i>&nbsp;&nbsp;[[Special:SpecialContact|<strong>SEND US YOUR QUESTIONS & FEEDBACK ABOUT THIS PAGE</strong>]]</td>
</table>
</table>

Revision as of 20:29, 6 June 2017

Rapid[edit]

Total cistern volume can be estimated by multiplying the depth of design storm....

<panelInfo>

</panelInfo>


STEP Rainwater Harvesting Tool[edit]

The Sustainable Technologies Evaluation Program have produced a rainwater harvesting design and costing tool specific to Ontario. The tool is in a simple to use Excel format and is free to download.

<panelWarning> STEP Rainwater Harvesting Tool </panelWarning>


The Treatment Train Tool[edit]

Once the size of cistern has been determined, it can easily be modelled in many open source and proprietary applications.

In addition to the cistern size, modelling requires

<btnPrimary>The Treatment Train Tool</btnPrimary>