Changes

Jump to navigation Jump to search
Line 75: Line 75:
K<sub>f</sub> is the minimum acceptable saturated hydraulic conductivity of the filter media or planting soil when compacted to 85% maximum dry density (mm/h).
K<sub>f</sub> is the minimum acceptable saturated hydraulic conductivity of the filter media or planting soil when compacted to 85% maximum dry density (mm/h).


==Drainage time to empty facility==
==Time to drain the storage reservoir==
[[file:Hydraulic radius.png|thumb|Three footprint areas of 9 m<sup>2</sup>.<br>
[[file:Hydraulic radius.png|thumb|Three footprint areas of 9 m<sup>2</sup>.<br>
From left to right x = 12 m, x = 20 m]]
From left to right x = 12 m, x = 20 m]]
The target [[drainage time]] for the internal storage of an infiltration facility is typically between 48 and 72 hours or based on the average inter-event period for the location. See [[Drainage time]] for more information about how inter-event periods vary across Ontario and to help select what is suitable for the site. <br>
The target [[drainage time]] for the active storage reservoir depth of an infiltration facility is typically between 48 and 72 hours or based on the average inter-event period for the location. Contact the local municipality or conservation authority for criteria. See [[Drainage time]] for more information about how inter-event periods vary across Ontario and to help select what is suitable for the site. <br>
<br>
<br>


Navigation menu