Changes

Jump to navigation Jump to search
41 bytes removed ,  4 years ago
Line 10: Line 10:
The invert of the overflow should be placed at the maximum water surface elevation of the practice. i.e. the maximum ponding level.  
The invert of the overflow should be placed at the maximum water surface elevation of the practice. i.e. the maximum ponding level.  
A good starting point is 150 to 350 mm above the surface of the mulch cover. However, consideration should be given to public safety, whether or not an underdrain is included, and the time required for ponded water to drain through the filter bed surface (must drain within 48 hours).  
A good starting point is 150 to 350 mm above the surface of the mulch cover. However, consideration should be given to public safety, whether or not an underdrain is included, and the time required for ponded water to drain through the filter bed surface (must drain within 48 hours).  
See [[Bioretention: Sizing#Additional step for system without underdrain|Bioretention]] and [[Stormwater planters]]
See [[Bioretention: Sizing]] and [[Stormwater planters]] for more details.


===Freeboard===
===Freeboard===

Navigation menu