Line 25:
Line 25:
#where prohibitions and/or restrictions exist per approved Drinking Water Source Protection Plans (e.g. should not be used to treat pavement runoff within 2 year time of travel wellhead protection areas; see MOECC guidance).
#where prohibitions and/or restrictions exist per approved Drinking Water Source Protection Plans (e.g. should not be used to treat pavement runoff within 2 year time of travel wellhead protection areas; see MOECC guidance).
<br>
<br>
Infiltration facilities should be designed with drainage modifications where:
Infiltration facilities should be designed with modifications where:
#the underlying bedrock is within 1 m below the bottom of the proposed BMP, or
#the underlying bedrock is within 1 m below the bottom of the proposed BMP, or
#the seasonal high groundwater level (i.e. water table) comes within 1 m below the bottom of the proposed BMP.
#the seasonal high groundwater level (i.e. water table) comes within 1 m below the bottom of the proposed BMP.