Difference between revisions of "User talk:DanielFilippi"

From LID SWM Planning and Design Guide
Jump to navigation Jump to search
Line 59: Line 59:
rect 32 2 193 39 [[Infiltration trench| Infiltration Trench]]
rect 32 2 193 39 [[Infiltration trench| Infiltration Trench]]
rect 42 50 146 88 [[Curb cuts| Curb Cuts]]  
rect 42 50 146 88 [[Curb cuts| Curb Cuts]]  
rect 349 324 455 370 [[Curb cuts| Curb Cuts]]
rect 342 186 487 230 [[Infiltration trench| Infiltration Trench]]
rect 386 61 457 103 [[Trees| Trees]]
rect 87 96 187 138 [[Overflow| Overflow]]
rect 365 132 476 177 [[Plant lists| Vegetation]]
rect 65 234 146 284 [[Trees| Trees]]
rect 386 384 464 428 [[Trees| Trees]]
rect 18 559 133 609 [[Plant lists| Vegetation]]
rect 60 611 145 652 [[Overflow| Overflow]]
rect 0 628 58 674 [[Pipes| Overflow Pipe]]
rect 63 712 163 751 [[Curb cuts| Curb Cuts]]
rect 0 759 165 816 [[Reservoir aggregate| Clear Stone / Reservoir Aggregate]]
rect 386 714 501 747 [[Bioretention: Filter media| Filter Media]]
rect 372 750 500 786 [[Choker layer| Choker Layer]]
rect 347 788 454 816 [[Underdrain| Underdrain]]


</imagemap>
</imagemap>
    <area target="" alt="Curb Cuts" title="Curb Cuts" href="Curb cuts" coords="349,324,455,370" shape="rect">
    <area target="" alt="Infiltration Trench" title="Infiltration Trench" href="Infiltration trench" coords="342,186,487,230" shape="rect">
    <area target="" alt="Trees" title="Trees" href="Trees" coords="386,61,457,103" shape="rect">
    <area target="" alt="Overflow" title="Overflow" href="Overflow" coords="87,96,187,138" shape="rect">
    <area target="" alt="Vegetation" title="Vegetation" href="Plant lists" coords="365,132,476,177" shape="rect">
    <area target="" alt="Trees" title="Trees" href="Trees" coords="65,234,146,284" shape="rect">
    <area target="" alt="Trees" title="Trees" href="Trees" coords="386,384,464,428" shape="rect">
    <area target="" alt="Vegetation" title="Vegetation" href="Plant lists" coords="18,559,133,609" shape="rect">
    <area target="" alt="Overflow" title="Overflow" href="Overflow" coords="60,611,145,652" shape="rect">
    <area target="" alt="Overflow Pipe" title="Overflow Pipe" href="Pipes" coords="0,628,58,674" shape="rect">
    <area target="" alt="Curb Cuts" title="Curb Cuts" href="Curb cuts" coords="63,712,163,751" shape="rect">
    <area target="" alt="Clear Stone / Reservoir aggregate" title="Clear Stone / Reservoir aggregate" href="Reservoir aggregate" coords="0,759,165,816" shape="rect">
    <area target="" alt="Filter Media" title="Filter Media" href="Bioretention: Filter media" coords="386,714,501,747" shape="rect">
    <area target="" alt="Choker Layer" title="Choker Layer" href="Choker layer" coords="372,750,500,786" shape="rect">
    <area target="" alt="Underdrain" title="Underdrain" href="Underdrain" coords="347,788,454,816" shape="rect">
 




==References==
==References==

Revision as of 18:27, 13 September 2021

For Infiltration Trench[edit]

SoilConcrete curbRiver RockClearstoneUnderdrainsCrushed LimestoneConcrete curbWell-graded granular A Material (OPSS 1010)Crushed LimestoneGeotextile OPSS 1860 Approved FabricHigh performance beddingPermeable Pavements
This infiltration trench features an inlet composed of filter fabric and decorative river stone, which provides some pretreatment and can easily be removed and replaced as part of routine sediment removal maintenance. For more details click here.

For Downspout disconnection[edit]

DownspoutDownspout discussionSplash PadClearstoneNative SoilClayOPSS Backfill MaterialCoarse GravelWeeping Tile
This schematic shows proper downspout disconnection of a building's downspout system with associated setback distances and items (weeping tile pipes, gravel, splash pad, etc. For more details click here.[1]


Dry pond[edit]

Sediment ForebaysOutletVegetated filter stripsInletsBerms
The following image showcases an illustrates an extended detention dry pond. For more details click here.[2]


For Bioretention[edit]

Infiltration TrenchCurb CutsCurb CutsInfiltration TrenchTreesOverflowVegetationTreesTreesVegetationOverflowOverflow PipeCurb CutsClear Stone / Reservoir AggregateFilter MediaChoker LayerUnderdrain
This joint schematic with both Plan and Longitudinal Section views shows what a general biortention swale in a parking lot could look like.


References[edit]

  1. The Institute For Catastrophic Loss Reduction. Protect your home from Basement flooding: Designed for safer living®. https://www.iclr.org/wp-content/uploads/PDFS/protect-your-home-from-basement-flooding.pdf. 2011. Accessed 3 September, 2021
  2. Ministry of the Environment. Stormwater Management Planning and Design Manual. https://dr6j45jk9xcmk.cloudfront.net/documents/1757/195-stormwater-planning-and-design-en.pdf. 2003. Accessed 3 September, 2021