Changes

Jump to navigation Jump to search
Line 655: Line 655:
*As part of '''Construction inspections''', testing confirms that the roof layers have been installed correctly and that it is ready for planting.  
*As part of '''Construction inspections''', testing confirms that the roof layers have been installed correctly and that it is ready for planting.  
*As part of '''Assumption inspections''' it helps determine if the green roof is ready to be assumed by the property owner/manager/municipality.
*As part of '''Assumption inspections''' it helps determine if the green roof is ready to be assumed by the property owner/manager/municipality.
*Tests may also be done as part of Verification inspections (i.e., every five years) to check for leaks, and as part of FIT work to locate and repair leaks discovered through visual inspection work.
*Tests may also be done as part of '''Verification inspections''' (i.e., every five years) to check for leaks, and as part of FIT work to locate and repair leaks discovered through visual inspection work.


==Cistern Pump Testing==
==Cistern Pump Testing==

Navigation menu