The volumes infiltrated may also be used to meet site water balance requirements. Proponents will need to consult with local approval agencies to determine whether the typical 1 meter separation depth to groundwater may be waived given that the infiltrated water has been treated through the pond. | The volumes infiltrated may also be used to meet site water balance requirements. Proponents will need to consult with local approval agencies to determine whether the typical 1 meter separation depth to groundwater may be waived given that the infiltrated water has been treated through the pond. |