#'''Public Approach''': Municipality is responsible for performing or tracking inspection, maintenance and repair/rehabilitation of all BMPs that qualify for inclusion in their stormwater infrastructure program, whether located on public or private land (e.g., could include those implemented as part of a stormwater utility fee credit program or CSO abatement plan). See this approach currently being implemented in Mississauga under their [https://www.mississauga.ca/services-and-programs/home-and-yard/stormwater/stormwater-charge/stormwater-credit-for-non-residential-and-multi-residential-properties/ Stormwater Charge which included a Stormwater Credit program] for ICI and MUR properties within their jurisdiction. This charge program lists [https://www.mississauga.ca/wp-content/uploads/2022/02/17144148/Stormwater-Credit-Review-Report-2021.pdf eligible LID BMPs] to be considered for for meeting the stormwater credit requirements for peak flow reduction, runoff volume reduction and/or quality control (City of Mississauga, 2022)<ref>City of Mississauga. 2022. Stormwater Credit Program Review – Phase 2. Engineering Services under Contract 4600017285. Written by: Resilient Consulting Corporation. Project No. 2021-010 - January 2022. https://www.mississauga.ca/wp-content/uploads/2022/02/17144148/Stormwater-Credit-Review-Report-2021.pdf</ref> | #'''Public Approach''': Municipality is responsible for performing or tracking inspection, maintenance and repair/rehabilitation of all BMPs that qualify for inclusion in their stormwater infrastructure program, whether located on public or private land (e.g., could include those implemented as part of a stormwater utility fee credit program or CSO abatement plan). See this approach currently being implemented in Mississauga under their [https://www.mississauga.ca/services-and-programs/home-and-yard/stormwater/stormwater-charge/stormwater-credit-for-non-residential-and-multi-residential-properties/ Stormwater Charge which included a Stormwater Credit program] for ICI and MUR properties within their jurisdiction. This charge program lists [https://www.mississauga.ca/wp-content/uploads/2022/02/17144148/Stormwater-Credit-Review-Report-2021.pdf eligible LID BMPs] to be considered for for meeting the stormwater credit requirements for peak flow reduction, runoff volume reduction and/or quality control (City of Mississauga, 2022)<ref>City of Mississauga. 2022. Stormwater Credit Program Review – Phase 2. Engineering Services under Contract 4600017285. Written by: Resilient Consulting Corporation. Project No. 2021-010 - January 2022. https://www.mississauga.ca/wp-content/uploads/2022/02/17144148/Stormwater-Credit-Review-Report-2021.pdf</ref> |