Changes

Jump to navigation Jump to search
Line 405: Line 405:
|Surface ponding remains for > 48 hours or surface infiltration rate is < 15 mm/h.
|Surface ponding remains for > 48 hours or surface infiltration rate is < 15 mm/h.
|
|
*Remove sediment as described above. Core aerate (for grass swales); or remove [[stone]], sediment and [[vegetation|plant]] cover and till 5 cm of yard waste compost into the exposed planting [[Soil groups|soil]] to a depth of 20 cm; or remove and replace the uppermost 15 cm of material with planting soil that meets design specifications. Test [[Infiltration: Testing surface infiltration rate]] to confirm it has been restored to > 15 mm/h. Replace stone and plants (re-use/transplant where possible).
*Remove sediment as described above. Core aerate (for grass swales); or remove [[stone]], sediment and [[vegetation|plant]] cover and till 5 cm of yard waste compost into the exposed planting [[Soil groups|soil]] to a depth of 20 cm; or remove and replace the uppermost 15 cm of material with planting soil that meets design specifications. Test [[Infiltration: Testing|surface infiltration rate]] to confirm it has been restored to > 15 mm/h. Replace stone and plants (re-use/transplant where possible).
|-
|-
|Damage to filter bed or slide slope is present (e.g., [[erosion]] rills, animal burrows, sink holes, ruts)
|Damage to filter bed or slide slope is present (e.g., [[erosion]] rills, animal burrows, sink holes, ruts)

Navigation menu