====Tendering and contract====
====Tendering and contract====
The  project contract and tendered drawings, including details, notes, ESC requirements, material specifications, and testing requirements should align. Given that most standard contract templates do not include wording specific to LID construction, considerations for LID can be placed under special provisions within the contract.   
The  project contract and tendered drawings, including details, notes, ESC requirements, material specifications, and testing requirements should align. Given that most standard contract templates do not include wording specific to LID construction, considerations for LID can be placed under special provisions within the contract.   


Line 15: Line 14:

======Minimum contractor requirements======
======Minimum contractor requirements======
Many contractors are unfamiliar with building LID practices, so project managers should consider minimum contractor requirements. Contractor training, attendance at pre-bid meetings, LID project references, and bid bond insurance can be part of the requirements.
Many contractors are unfamiliar with building LID practices, so project managers should consider minimum contractor requirements. Consider contractor training, attendance at pre-bid meetings, LID project references, and bid bond insurance as prerequisites.