Changes

Jump to navigation Jump to search
m
Line 1: Line 1:
====Tendering and contract====
===Tendering and contract===
The  project contract and tendered drawings, including details, notes, ESC requirements, material specifications, and testing requirements should align. Given that most standard contract templates do not include wording specific to LID construction, considerations for LID can be placed under special provisions within the contract.   
The  project contract and tendered drawings, including details, notes, ESC requirements, material specifications, and testing requirements should align. Given that most standard contract templates do not include wording specific to LID construction, considerations for LID can be placed under special provisions within the contract.   


722

edits

Navigation menu