Difference between revisions of "Construction: erosion and sediment control inspection and maintenance"
Jump to navigation
Jump to search
Kyle menken (talk | contribs) (Created page with "===Erosion and sediment control inspection and maintenance=== ESC measures require ongoing attention to ensure integrity and performance. ESC inspections should take place, at minimum, during installation, after rainfall events, and at the critical inspection points discussed in the Pre-construction: communication, inspection plan, and utilities coordination section. At these inspections, keep an eye out for accumulated sediment, worn materials, compliance with the...") |
(No difference)
|
Revision as of 12:50, 2 August 2022
Erosion and sediment control inspection and maintenance[edit]
ESC measures require ongoing attention to ensure integrity and performance. ESC inspections should take place, at minimum, during installation, after rainfall events, and at the critical inspection points discussed in the Pre-construction: communication, inspection plan, and utilities coordination section.
At these inspections, keep an eye out for accumulated sediment, worn materials, compliance with the project's staging plan, and potential failure points.