m (Replaced content with "{{TOClimit|2}} ==Overview== *''Importance of construction inspections'' *''Building capacity in the construction industry'' STEP divides the construction process for LID practices into five categories: #Pre-construction #Excavation and grading #Backfill granular, utilities and pipes #Finishing grades: inlet, outlet, and surface layer #Post-construction Pre-construction")
Tag: Replaced
Line 2: Line 2:


==Overview==
==Overview==
*
*''Importance of construction inspections''
*''Importance of construction inspections''
*''Building capacity in the construction industry''
*




STEP divides the construction process for LID practices into five categories:  
STEP divides the construction process for LID practices into five categories:  
#Pre-construction
#Pre-construction
#Excavation and grading
#Excavation and grading
Line 14: Line 14:
#Post-construction
#Post-construction


[[Pre-construction]]
The first three categories of construction process are fundamentally the same for all ground-level LID types. For example, the STEP-recommended processes for excavation do not differ between practice type: excavation is excavation, whether it is for a bioretention or a permeable paver facility.

Revision as of 16:02, 2 August 2022

Overview[edit]

  • Importance of construction inspections


STEP divides the construction process for LID practices into five categories:

  1. Pre-construction
  2. Excavation and grading
  3. Backfill granular, utilities and pipes
  4. Finishing grades: inlet, outlet, and surface layer
  5. Post-construction

The first three categories of construction process are fundamentally the same for all ground-level LID types. For example, the STEP-recommended processes for excavation do not differ between practice type: excavation is excavation, whether it is for a bioretention or a permeable paver facility.