Difference between revisions of "Construction: tendering and contract"
Kyle menken (talk | contribs) (Created page with "====Tendering and contract==== Ensure there is alignment between contract and tendered drawings, including their details, notes, ESC requirements, material specifications, and testing requirements. Given that most standard contract templates do not include this wording, considerations for LID can be placed under special provisions within the contract. A clear tender attracts experienced contractors to the project. A detailed bid form that accurately reflects the entir...") |
Kyle menken (talk | contribs) |
||
(11 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
The project contract and tendered drawings, including details, notes, ESC requirements, material specifications, and testing requirements should align. Given that most standard contract templates do not include wording specific to LID construction, considerations for LID can be placed under special provisions within the contract. | |||
Details within the drawings and contract should also be accurately reflected in the tender bid form. A detailed bid form that reflects the entirety of the work allows contractors to deliver accurate bids, lessens the likelihood of project shortcuts, and helps to ensure transparency amongst bids. Ultimately, clear bid pricing reduces the potential for misunderstandings and conflicts and attracts experienced contractors. | |||
=====Minimum contractor requirements===== | |||
Many contractors are unfamiliar with building LID practices, so project managers should consider minimum contractor requirements. Consider mandating contractor training, attendance at pre-bid meetings, LID project references, and bid bond insurance as prerequisites. | |||
Many contractors are unfamiliar with building LID practices |
Latest revision as of 16:59, 3 August 2022
The project contract and tendered drawings, including details, notes, ESC requirements, material specifications, and testing requirements should align. Given that most standard contract templates do not include wording specific to LID construction, considerations for LID can be placed under special provisions within the contract.
Details within the drawings and contract should also be accurately reflected in the tender bid form. A detailed bid form that reflects the entirety of the work allows contractors to deliver accurate bids, lessens the likelihood of project shortcuts, and helps to ensure transparency amongst bids. Ultimately, clear bid pricing reduces the potential for misunderstandings and conflicts and attracts experienced contractors.
Minimum contractor requirements[edit]
Many contractors are unfamiliar with building LID practices, so project managers should consider minimum contractor requirements. Consider mandating contractor training, attendance at pre-bid meetings, LID project references, and bid bond insurance as prerequisites.