Changes

Jump to navigation Jump to search
m
Line 57: Line 57:
==Finishing grades and surface layer installation==
==Finishing grades and surface layer installation==
This construction stage differs between LID practice type. The finishing grades and surface layer installation page has guidance for vegetated LIDs and non-vegetated LIDs (i.e., permeable pavements). In many cases the surface of infiltration systems will be traditional asphalt, concrete, or pavers; STEP does not provide guidance on installing non-permeable surfaces.   
This construction stage differs between LID practice type. The finishing grades and surface layer installation page has guidance for vegetated LIDs and non-vegetated LIDs (i.e., permeable pavements). In many cases the surface of infiltration systems will be traditional asphalt, concrete, or pavers; STEP does not provide guidance on installing non-permeable surfaces.   
*soil media installation and soil amendment
*finish grading
*large stone and riprap
*plant verification and installation
*mulch placement
*stabilizing contributing drainage area and planting adjacent vegetation
*as-built survey


{| class="wikitable"
{| class="wikitable"
Line 72: Line 64:
!Permeable pavements
!Permeable pavements
|-
|-
|*geotextile (if applicable)
|soil media installation and soil amendments
| PP
| PP


|-
|-
|*underdrain
|finish grading
| PP
| PP


|-
|-
|*impermeable liners
|large stone and riprap
|PP
|PP


|-
|-
|*overflow
|plant verification and installation
|PP
|PP


|-
|-
|*monitoring wells
|mulch placement
|pp
|pp


|-
|-
|*storage reservoir
|stabilizing contributing drainage area and planting adjacent vegetation
|PP
 
|-
|stone choker layer
|PP
|PP


|-
|-
|curbing
|as-built survey
|PP
|PP
|-
|*pre-treatment and inlet
|


|}
|}
722

edits

Navigation menu