Changes

Jump to navigation Jump to search
13 bytes added ,  7 years ago
no edit summary
Line 2: Line 2:
**When the membrane is being used directly in the ground, punctures from stones can be prevented by compacting a layer sand (30  - 50 mm) over the soil prior to installing the membrane.  
**When the membrane is being used directly in the ground, punctures from stones can be prevented by compacting a layer sand (30  - 50 mm) over the soil prior to installing the membrane.  
**Similarly, a 50 mm sand layer should be applied on top of the membrane to protect it from the clear stone being used for drainage inside the BMP.   
**Similarly, a 50 mm sand layer should be applied on top of the membrane to protect it from the clear stone being used for drainage inside the BMP.   
 
{{:Feedback}}
[[Category:Materials]]
[[Category:Materials]]

Navigation menu