Changes

Jump to navigation Jump to search
m
no edit summary
Line 10: Line 10:
*Have land uses changed while the design was in progress? Are there any planned land-use changes on adjacent properties and is their drainage connected to the site?
*Have land uses changed while the design was in progress? Are there any planned land-use changes on adjacent properties and is their drainage connected to the site?
*Will adjacent land uses create dirty runoff that may flow onto the construction site or into the LID feature?
*Will adjacent land uses create dirty runoff that may flow onto the construction site or into the LID feature?
*Is additional ESC required beyond what is marked in the ESC plan?
*Is additional erosion and sediment control (ESC) measures required beyond what is marked in the ESC plan?


|-
|-
Line 21: Line 21:
|-
|-
|Seasonal maintenance operations||
|Seasonal maintenance operations||
*Will winter snow storage and salt or sand application impact the LID feature?
*Will [[winter]] snow storage and [[salt]] or sand application impact the LID feature?
|-
|-
|Location of LID features||
|Location of LID features||
722

edits

Navigation menu