Difference between revisions of "Turf reinforcement"
Jump to navigation
Jump to search
Jenny Hill (talk | contribs) (Created page with "Turf reinforcement mats (TRM) may be required in swales which are designed to convey higher velocity events. Most TRM are made of synthetic fibres and intended as a permanent...") |
Jenny Hill (talk | contribs) |
||
Line 1: | Line 1: | ||
Turf reinforcement mats (TRM) may be required in swales which are designed to convey higher velocity events. Most TRM are made of synthetic fibres and intended as a permanent part of the construction (unlike a temporary [[Erosion control | Turf reinforcement mats (TRM) may be required in swales which are designed to convey higher velocity events. Most TRM are made of synthetic fibres and intended as a permanent part of the construction (unlike a temporary [[Erosion control blankets|ECB]]). | ||
*Mats should be applied with soil fill technique: | *Mats should be applied with soil fill technique: | ||
**Grade the swale and smooth the top soil, removing any debris and large rocks, | **Grade the swale and smooth the top soil, removing any debris and large rocks, | ||
Line 9: | Line 9: | ||
**Anchor the bottom end of the channel in a similar fashion to the top, | **Anchor the bottom end of the channel in a similar fashion to the top, | ||
**Apply 15-20 mm of topsoil over the TRM, without the use of heavy machinery which can tear the mat and/or compact the soil. | **Apply 15-20 mm of topsoil over the TRM, without the use of heavy machinery which can tear the mat and/or compact the soil. | ||
**An [[Erosion control | **An [[Erosion control blankets|ECB]] may be applied to protect the surface through the first one or two years. | ||
**Irrigate until turf grass is established. | **Irrigate until turf grass is established. | ||
[[category: materials]] | [[category: materials]] |
Revision as of 14:34, 6 July 2017
Turf reinforcement mats (TRM) may be required in swales which are designed to convey higher velocity events. Most TRM are made of synthetic fibres and intended as a permanent part of the construction (unlike a temporary ECB).
- Mats should be applied with soil fill technique:
- Grade the swale and smooth the top soil, removing any debris and large rocks,
- Seed with turf mixture,
- Dig 150 mm anchor trench at the top of the channel,
- Secure blanket into the trench with staples every 300 mm. Backfill and compact soil into the trench.
- Unroll mat in the direction of flow. Staple as recommended by manufacturer.
- Overlaps should be 150 mm and stapled. Upstream mat should always overlay the downstream mat.
- Anchor the bottom end of the channel in a similar fashion to the top,
- Apply 15-20 mm of topsoil over the TRM, without the use of heavy machinery which can tear the mat and/or compact the soil.
- An ECB may be applied to protect the surface through the first one or two years.
- Irrigate until turf grass is established.