Line 10:
Line 10:
Regular inspections throughout the construction process of LID practices prevent end products that are not built to the design specifications. Specifically, they ensure that:
Regular inspections throughout the construction process of LID practices prevent end products that are not built to the design specifications. Specifically, they ensure that:
*the LID practice has a proper layout, location, footprint, and volume;
*the LID practice has the proper layout, location, footprint, and volume;
*materials meet design specifications;
*materials meet design specifications;
*material substitutions and any field changes to the design are verified and documented;
*the contributing drainage area is stabilized before the LID practice becomes operational;
*the contributing drainage area is stabilized before the LID practice becomes operational;
*environmentally sensitive areas and the LID practices themselves are protected during construction; and
*environmentally sensitive areas and the LID practices themselves are protected during construction; and