* Designs include [[pretreatment]] through hydrodynamic separator ([[Oil and Grit Separator]]).  
* Designs include [[pretreatment]] through hydrodynamic separator ([[Oil and Grit Separator]]).
* Operation and maintenance cost estimates assume rehabilitation of the filter media bed surface is required after 25 years of operation.
* The tool calculates costs for new (greenfield) development contexts and includes costs for contractor overhead and profit, material, delivery, labour, equipment (rental, operating and operator costs), hauling and disposal.  
* The tool calculates costs for new (greenfield) development contexts and includes costs for contractor overhead and profit, material, delivery, labour, equipment (rental, operating and operator costs), hauling and disposal.  
** Land value and equipment mobilization and demobilization costs are not included, assuming BMP construction is part of overall development site construction.
** Land value and equipment mobilization and demobilization costs are not included, assuming BMP construction is part of overall development site construction.