<li>Determine the drainage catchment area (A<sub>D</sub>), and outline the location of the bioretention facility. To begin with, budget for at least 10% of the contributing impervious area to be required for the BMP. </li></li> | <li>Determine the drainage catchment area (A<sub>D</sub>), and outline the location of the bioretention facility. To begin with, budget for at least 10% of the contributing impervious area to be required for the BMP. </li></li> |