<li>The site of the infiltration practice should remain outside the limit of disturbance until construction of the facility begins, to prevent soil compaction by heavy equipment. </li>
<li>The site of the infiltration facility must remain outside the limit of disturbance and blocked from site traffic until construction of the facility begins, to prevent soil compaction by heavy equipment. </li>
<li>This area must not be used as the site of sediment basins during construction, as the concentration of fines will reduce post-construction infiltration. </li>
<li>This area must not be used as the site of sediment basins during construction, as the concentration of fines will reduce post-construction infiltration. </li>
<li>This area must not be use as a staging area, for storing materials. </li>
<li>This area must not be use as a staging area, for storing materials. </li>
Line 12: Line 12:
<li>The pretreatment part of the design should be excavated first and sealed until full construction is completed,</li>
<li>The pretreatment part of the design should be excavated first and sealed until full construction is completed,</li>
<li>Excavators or backhoes <em>working adjacent to the proposed infiltration area</em> should excavate to the appropriate design depth,</li>
<li>Excavators or backhoes <em>working adjacent to the proposed infiltration area</em> should excavate to the appropriate design depth,</li>
<li>The soil in the bottom of the excavation may be ripped to promote greater infiltration,</li>  
<li>The soil in the bottom of the excavation should be ripped to promote greater infiltration,</li>  
<li>Any accidental sediment accumulation from construction should be removed at this time,</li>
<li>Any accidental sediment accumulation from construction should be removed at this time,</li>