<p>Decisions need to be made about the selection and grading of catchments. If one catchment is very large, can it be regraded to drain to two or more outlets? Is it desirable to capture both rooftop water and other stormwater? This will may determine the quality improvements required to use the water. See table below, which illustrates the higher treatment required for storm water (i.e. non-rooftop). </p> | <p>Decisions need to be made about the selection and grading of catchments. If one catchment is very large, can it be regraded to drain to two or more outlets? Is it desirable to capture both rooftop water and other stormwater? This will may determine the quality improvements required to use the water. See table below, which illustrates the higher treatment required for storm water (i.e. non-rooftop). </p> |