Difference between revisions of "User talk:Jenny Hill"

From LID SWM Planning and Design Guide
Jump to navigation Jump to search
(Created page with "{{plainlist| *Five percent of the average annual yield can be estimated: *<strong>Y<sub>0.05</sub>= A × C<sub>vol, A</sub> × R<sub>a</sub> × e × 0.05</strong> *Y<sub>...")
 
(Blanked the page)
Line 1: Line 1:
{{plainlist|
*Five percent of the average annual yield can be estimated:
*<strong>Y<sub>0.05</sub>&#61;  A × C<sub>vol, A</sub> × R<sub>a</sub> × e × 0.05</strong>
*Y<sub>0.05</sub> &#61;  Five percent of the average annual yield (L)
*A &#61;  The catchment area (m<sup>2</sup>)
*C<sub>vol, A</sub> &#61;  The annual runoff coefficient for the catchment
*R<sub>a</sub> &#61;  The average annual rainfall depth (mm)
*e &#61; The efficiency of the pre-storage filter
}}


{{demo|class=woo|
* Five percent of the average annual yield can be estimated
* e &#61;  The efficiency of the pre-storage filter
}}

Revision as of 01:14, 12 August 2017