Changes

Jump to navigation Jump to search
Line 33: Line 33:
}}
}}


===Planning===
==Planning==
NEW CONTENT HERE?
NEW CONTENT HERE?


<h4>Soil infiltration rate</h4>
<h4>Soil infiltration rate</h4>
[[Infiltration: Testing|Infiltration tests]] must be undertaken at the location, depth and with a head of water that replicates the proposed design.  
[[Infiltration: Testing|Infiltration tests]] must be undertaken at the location, depth and with a head of water that replicates the proposed design.  
{|class="wikitable"
|+ Suggested safety factors to be applied to measured percolation rate when designing infiltration facilities
|-
!style="background: darkcyan; color: white" rowspan = "2"|Catchment area
!style="background: darkcyan; color: white" colspan="3"|Consequence of failure
|-
!No damage or inconvenience
!Minor damage or inconvenience to external structures (e.g. ponding in parking lot)
!Significant damage to buildings or infrastructure (e.g. flooding damage)
|-
|<100 m<sup>2</sup>||1.5||2||10
|-
|100 - 1000 m<sup>2</sup>||1.5||3||10
<table class="table-responsive table table-striped">
<table class="table-responsive table table-striped">
         <caption><strong>Suggested safety factors to be applied to measured percolation rate when designing infiltration facilities</strong></caption>
         <caption><strong>Suggested safety factors to be applied to measured percolation rate when designing infiltration facilities</strong></caption>

Navigation menu