Line 77: |
Line 77: |
|
| |
|
| ==Data Analysis/Modelling== | | ==Data Analysis/Modelling== |
| Suggest detailed modelling to evaluate how source and conveyance controls could provide a flood control function | | *Suggest detailed modelling to evaluate how source and conveyance controls could provide a flood control function |
| Fieldwork | | *Fieldwork |
| Visit sites to record information/interview designer/landowner | | *Visit sites to record information/interview designer/landowner |
| Technical Input/Design Considerations | | *Technical Input/Design Considerations |
| If flood control is your goal how does that impact other performance measures? | | *If flood control is your goal how does that impact other performance measures? |
| How do other combinations of infrastructure impact effectiveness? For example, underdrains, ponding overflow drains, and inlets/outlets may significantly reduce the effectiveness of the practice to retain runoff and also increase costs? | | *How do other combinations of infrastructure impact effectiveness? For example, underdrains, ponding overflow drains, and inlets/outlets may significantly reduce the effectiveness of the practice to retain runoff and also increase costs? |
| How would we have designed Elm Drive differently? | | *How would we have designed Elm Drive differently? |
| Reducing the potential to mobilize and wash out soil media and erode the practice (this was a big concern raised by Mississauga with the LRT) | | *Reducing the potential to mobilize and wash out soil media and erode the practice (this was a big concern raised by Mississauga with the LRT) |
| Inlet design to accept the minor and major system | | *Inlet design to accept the minor and major system |
| How to incorporate emergency overflow structures into the design? | | *How to incorporate emergency overflow structures into the design? |
| What features can be incorporated to all you to adjust the infrastructure? | | *What features can be incorporated to all you to adjust the infrastructure? |
| Operation & Maintenance considerations | | ===Operation & Maintenance considerations=== |
| Reporting
| |
| Literature Review Summary
| |
| TOC/Outline
| |
| First Draft
| |
| Second Draft
| |
| Final
| |
| Meeting with Executive Planning Committee (@TRCA)
| |
| 5 meetings
| |
| Webinar with CO
| |
| Planning Webinar
| |
| Attend Webinar
| |
| Internal CVC
| |
| Chapter coordination etc.
| |
| | |
| | |
| | |
|
| |
|
| Check for related content on [[Peak flow]] | | Check for related content on [[Peak flow]] |