Line 67: |
Line 67: |
| The LID option that best fits your site will depend what types | | The LID option that best fits your site will depend what types |
| of source areas are present. Types of source areas include: | | of source areas are present. Types of source areas include: |
| • Active use area
| | * Active use area |
| • Passive use area
| | * Passive use area |
| • Pedestrian walkway
| | * Pedestrian walkway |
| • Internal driveway
| | * Internal driveway |
| • Parking lot
| | * Parking lot |
| On park sites, pollution prevention is often associated with | | On park sites, pollution prevention is often associated with |
| changes to operations and maintenance practices and has | | changes to operations and maintenance practices and has |
Line 133: |
Line 133: |
| and staff than small-scale projects. Large-scale LID projects | | and staff than small-scale projects. Large-scale LID projects |
| include: | | include: |
| *Bioretention | | * Bioretention |
| * Enhanced grass swales | | * Enhanced grass swales |
| * Bioswales | | * Bioswales |
Line 151: |
Line 151: |
| quality and quantity objectives. Consider using an infiltration | | quality and quantity objectives. Consider using an infiltration |
| chamber or bioswale project to meet those objectives. | | chamber or bioswale project to meet those objectives. |
| | |
| Before starting a large-scale retrofit project, consider the | | Before starting a large-scale retrofit project, consider the |
| following distinctions that set these retrofits apart from smallscale | | following distinctions that set these retrofits apart from small-scale projects.<br> |
| projects.<br> | |
| '''<h4>Integration with capital works programs</h4>''' | | '''<h4>Integration with capital works programs</h4>''' |
| Most large-scale LID retrofits must function with existing | | Most large-scale LID retrofits must function with existing |