Difference between revisions of "Talk:Soakaways, Infiltration Trenches and Infiltration Chambers Guide"
Jump to navigation
Jump to search
Line 1: | Line 1: | ||
{| class="wikitable" style="width: | {| class="wikitable" style="width: 100%; height: 200px;" | ||
|- | |- | ||
!colspan="2" style="background:white; color:black"| LID Practice | !colspan="2" style="background:white; color:black"| LID Practice |
Revision as of 17:06, 10 October 2017
LID Practice | CANADA | United States | |||||||
---|---|---|---|---|---|---|---|---|---|
Soakaways, Infiltration Trenches and Chambers | CVC+TRCA (Factsheets-2010)[1] | Toronto- 2016 | LID-SWM Guide 2010[2] | Massachusets SW BMP-2013 | District of Columbia-SWM Guidebook-2010 | W. Virginia-SWM design guidance manual-2012 | Pennsylvania-City of Philadelphia green St. design manual-2014 | Oregon SWM Manual-2014 | |
Setback from building Foundation(m) | 4 | 4 | |||||||
(Impervious drainage/treatment) area | 5:1-20:1, 10:1 recommended | 5:1-20:1, 10:1 recommended | CDA < 5 acres | CDA < 2 acres (T), < 5 acres (B) | < 2 acres | Max. load of 10:1 for infiltration systems (not specific to LID type) | |||
Natural Slope (%) | < 15 | < 15 | |||||||
A capped vertical sandpipe, perfored instaled to the bottom of the facility to monitor drainage time | 100-150 mm | 100-150 mm | |||||||
Filter Mdia | |||||||||
Stone Resvoir | 1.5" to 3" stone dia., 2" pea gravel above 6" sand below | 1.5"-3.5" stone dia. For stone layer, 3" layer of washed river stone, or No. 8 or 89 stone above, 6-8 " of sand below | Stone 1.5"-3.5" | Drain rock 3/4"-2.5 " washed open graded aggregate | |||||
Void space(%) | 30-40 | 30-40 | 30-40 | ||||||
Granular material (clear stone)(mm) | 50 | 50 | 50 | ||||||
Geotextile around the stone reservoirwith an overlap at the top | min. 300 mm | 300 | min. 300 mm | ||||||
Bottom widh of excavations (mm) | 600-2400 | 600-2400 | 600-2400 | ||||||
Minimum depth of excavations under concrete laneway (mm) | 3000 | ||||||||
length of time for draining after storm event (>25mm) | max. 72 hr | max.72 hr, 48 recommended | |||||||
Depth to high water table (m) | 1 | 1 | |||||||
Sand layer depth (mm) | 150-300 | ||||||||
Subdrains Inlet pipes (mm) | 100-200 | ||||||||
Overflow ( if infiltration rate ) | < 15 mm/hr | ||||||||
Facilties reciving road runoff are not located within time of travel wellhead protection areas, year | 2 | 2 |