Exfiltration trenches are similar to [[infiltration trenches]] but differ primarily in the the manner in which stormwater is delivered to the trench.<br>
Exfiltration trenches are similar to [[infiltration trenches]] but differ primarily in the the manner in which stormwater is delivered to the trench.<br>
Runoff enters infiltration trenches directly by infiltration from the surface. In exfiltration systems, surface runoff is collected by drainage [[inlets]] and delivered to the trench via subsurface perforated [[pipes]].
Runoff enters infiltration trenches directly by infiltration from the surface. In exfiltration systems, surface runoff is collected by drainage [[inlets]] and delivered to the trench via subsurface perforated [[pipes]].

Revision as of 02:06, 14 November 2017

Exfiltration trench under high flow and exfiltration conditions

Exfiltration trenches are similar to infiltration trenches but differ primarily in the the manner in which stormwater is delivered to the trench.
Runoff enters infiltration trenches directly by infiltration from the surface. In exfiltration systems, surface runoff is collected by drainage inlets and delivered to the trench via subsurface perforated pipes.

Overview[edit]

Exfiltration systems can be thought of as linear soakaways; designed for both conveyance and infiltration of excess stormwater. By attenuating runoff volume, they reduce contaminant loads delivered to downstream BMPs, end-of-pipe facilities or receiving waterbodies.

They are composed of perforated pipes installed in gently sloping granular stone beds that are lined with geotextile fabric

Exfiltration systems can be used in place of conventional storm sewer pipes, where topography, water table depth, and water quality conditions are suitable. They are suitable for treating runoff from roofs, walkways, parking lots and low to medium traffic roads, with adequate pretreatment.

Perforated catchbasins are a design variation, where the sump is perforated to allow runoff to infiltrate into the underlying soil.

Exfiltration systems can also be referred to as perforated pipe systems, pervious pipe systems, clean water collector systems and percolation drainage systems.

Planning[edit]

If properly located, designed and maintained, perforated pipe systems can greatly reduce runoff volume while having little or no surface footprint, which helps to conserve highly valued developable land.

Systems should be located below shoulders of roadways, permeable paving or swales where they can be readily excavated for servicing. An adequate subsurface area outside of the 4 m setback from building foundations and suitable distance from other underground utilities must be available.

Site Topography[edit]

Systems cannot be located on natural slopes > 15 %.

Design[edit]

Geometry and Site Layout[edit]

Gravel beds in which exfiltration systems are installed are typically rectangular excavations with a bottom width between 0.6 and 2.4 m [1].

The gravel beds should have gentle slopes between 0.5 - 1%.

Performance[edit]

Ability of exfiltration systems to meet SWM objectives
Water balance benefit Water quality improvement Erosion control benefit
Yes Yes Partial: depending on soil infiltration rate

Water balance[edit]

The degree to which water balance objectives are met will depend on the underlying native soil type on which the system is located. Several Ontario studies have assess the performance of exfiltration systems in cold climates.

Volumetric runoff reduction achieved by exfiltration systems
Practice Location Underlying soil type Runoff reduction
Grass swale/perforated pipe Nepean, ON[2] Silty till 73 %
Grass swale/perforated pipe Nepean, ON[2] Sandy silty till 86 %
Perforated pipe Etobicoke, ON[3] Clay/clayey silty till over silty sand 95 %
Perforated pipe North york, ON[3] Silty sand 89 %

Runoff reduction estimate = 85 % on HSG A and B soils.
Runoff reduction estimate = 45 % on HSG C and D soils.

Pollutant removal capacity[edit]

Performance results from a limited number of field studies indicate that subsurface stormwater infiltration practices are effective BMPs for pollutant removal [4]. These types of practices provide effective removal for many pollutants as a result of sedimentation, filtering, and soil adsorption. It is also important to note that there is a relationship between the water balance and water quality functions. If an infiltration practice infiltrates and evaporates 100% of the runoff from a site, then there is essentially no pollution leaving the site in surface runoff. Furthermore, treatment of infiltrated runoff continues to occur as it leaves the facility and moves through the native soil. The performance of perforated pipe systems would be expected to reduce pollutants in runoff in a manner similar to infiltration trenches.

Several studies of exfiltration systems in Ontario have examined their water quality benefits. Seasonal contaminant load reductions in the order of 80% were observed for most constituents, with the exception of chloride, in the study of the system installed in a low density residential neighbourhood in Etobicoke [5][3]. Perforated pipe systems that incorporate grassed swales as pretreatment have been observed to reduce loads of suspended sediment, phosphorus, nitrogen, copper, lead and zinc in runoff flowing from the system between 75 to 90% in comparison to a similar catchment with conventional catchbasins and storm sewers [6]. The Nepean systems were shown to release significantly less pollutants than the conventional sewer system, even after 20 years of operation[2].

Pollutant removal efficiencies of exfiltration systems
Practice Location Lead % Copper % Zinc % Total suspended solids (TSS) % Total Phosphorus % Total Nitrogen (TKN) %
Soakaway Valence, France[7] 98 - 54 - 88 - - -
Infiltration trench Various[8] 70 - 90 70 - 90 70 - 90 70 - 90 50 - 70 40 - 70
Grass swale/perforated pipe North York, ON[5] 75 96 93 24 84 84
Grass swale/perforated pipe Nepean, ON[2] - 99 66 0 81 81 72
Grass swale/perforated pipe Nepean, ON[2] > 99 > 99 90 96 93 93

External resources[edit]

https://www.chijournal.org/C390


  1. Greater Vancouver Regional District. 2005. Stormwater Source Control Design Guidelines 2005. Prepared by Lanarc Consultants Limited, Kerr Wood Leidal Associates Limited and Goya Ngan
  2. 2.0 2.1 2.2 2.3 2.4 J.F. Sabourin and Associates Incorporated. 2008a. 20 Year Performance Evaluation of Grassed Swale and Perforated Pipe Drainage Systems. Project No. 524(02). Prepared for the Infrastructure Management Division of the City of Ottawa. Ottawa, Ontario.
  3. 3.0 3.1 3.2 Stormwater Assessment Monitoring and Performance (SWAMP) Program. 2005. Synthesis of Monitoring Studies Conducted Under the Stormwater Assessment Monitoring and Performance Program.. Toronto and Region Conservation Authority, Toronto, Ontario.
  4. Toronto and Region Conservation (TRCA). 2009. Review of the Science and Practice of Stormwater Infiltration in Cold Climates. Prepared under the Sustainable Technologies Evaluation Program (STEP). Toronto, Ontario.
  5. 5.0 5.1 Stormwater Assessment Monitoring and Performance (SWAMP) Program. 2002. Performance Assessment of a Swale/Perforated Pipe Stormwater Infiltration System – Toronto, Ontario. Toronto and Region Conservation Authority, Toronto, Ontario.
  6. J.F. Sabourin and Associates Incorporated. 1999. Research Project for the Updated Investigation of the Performance Evaluation of Grass Swales and Perforated Pipe Drainage Systems. Executive Summary. Prepared for the Infrastructure Management Division of the City of Ottawa. Ottawa, Ontario.
  7. Barraud, S., Gautier, A., Bardin, J.P., Riou, V. 1999. The Impact of Intentional Stormwater Infiltration on Soil and Groundwater. Water Science and Technology. Vol. 39. No. 2. pp. 185-192.
  8. ASCE (2000)Pollutant removal efficiencies are reported as ranges because they are based on a synthesis of several performance monitoring studies that were available as of 2000.