Changes

Jump to navigation Jump to search
m
Line 69: Line 69:
==Assess effectiveness==
==Assess effectiveness==


Once the suite of best management practices have been selected and the models have been run, a comparison of the results and the environmental design criteria can be made. An iterative approach, which involves adjusting the size or adding/deleting BMPs should be used until the environmental design criteria are met. The [http://www.sustainabletechnologies.ca/wp/low-impact-development-treatment-train-tool/ LID Treatment Train Tool] can help with adjusting the size of the features to see if criteria are met. Once met, the project can proceed to the detailed design stage.
After selecting a suite of BMPs and running the models, make a comparison between the modelling results results and the environmental design criteria. Employ nn iterative approach, which involves adjusting the size or adding/deleting BMPs until the environmental design criteria are met. The [http://www.sustainabletechnologies.ca/wp/low-impact-development-treatment-train-tool/ LID Treatment Train Tool] can help with adjusting the size of the features to meet design criteria. Once met, the project can proceed to the detailed design stage.
722

edits

Navigation menu