Difference between revisions of "Permeable pavement: Plan review"
Jump to navigation
Jump to search
Jenny Hill (talk | contribs) (Created page with "==Plan checklist== #Do the plans include an appropriate construction sequence that is specific to the construction of the permeable pavement? #To avoid soil disturbance and co...") |
(No difference)
|
Revision as of 13:42, 15 December 2017
Plan checklist[edit]
- Do the plans include an appropriate construction sequence that is specific to the construction of the permeable pavement?
- To avoid soil disturbance and compaction during construction, will the proposed infiltration area be clearly marked before any site work begins?
- Do the plans include an appropriate cross-sectional detail for the permeable pavement?