Changes

Jump to navigation Jump to search
m
no edit summary
Line 1: Line 1:
==Plan checklist==
==Plan checklist==
#Do the plans include an appropriate construction sequence that is specific to the construction of the permeable pavement?
#Do the plans include an appropriate construction sequence that is specific to the construction of the [[permeable pavement]]?
#To avoid soil disturbance and compaction during construction, will the proposed infiltration area be clearly marked before any site work begins?
#To avoid soil disturbance and compaction during construction, will the proposed infiltration area be clearly marked before any site work begins?
#Do the plans include an appropriate cross-sectional detail for the permeable pavement?
#Do the plans include an appropriate cross-sectional detail for the permeable pavement?

Navigation menu