Changes

Jump to navigation Jump to search
m
Line 1: Line 1:
<div class="col-md-8">
{{TOClimit}}
{{TOClimit|2}}
[[File:Cistern Size.png|thumb|Schematic diagram of the inputs and outputs to a rainwater harvesting cistern]]
 
===Simple===
===Rapid===
The following approximations 
<p>Five percent of the average annual yield can be estimated:<br>
Five percent of the average annual yield can be estimated:
<strong>Y<sub>0.05</sub>= A × C<sub>vol</sub> × R<sub>a</sub> × e × 0.05</strong>
<math>Y_{0.05} = A_{c} \times C_{vol,A}\times R_{a} \times e \times 0.05</math>
<br>Y<sub>0.05</sub> = Five percent of the average annual yield (L)
{{plainlist|Where:
<br>A = The catchment area ( m<sup>2</sup>)
*''Y<sub>0.05</sub>'' is five percent of the average annual yield (L)
<br>C<sub>vol</sub> = The runoff coefficient for the catchment
*''A<sub>c</sub>'' is the catchment area (m<sup>2</sup>)
<br>R<sub>a</sub> = The average annual rainfall depth (mm)
*''C<sub>vol, A</sub>'' is the annual runoff coefficient for the catchment
<br>e = The efficiency of the pre-storage filter
*''R<sub>a</sub>'' is the average annual rainfall depth (mm)
</p>
*''e'' is the efficiency of the pre-storage filter}}
<p>Five percent of the average annual demand (D<sub>0.05</sub>) can be estimated:<br>
*Filter efficiency (''e'') can be reasonably estimated as 0.9 pending manufacturer’s information.<br>
<strong>D<sub>0.05</sub> =  P<sub>d</sub> × n × 18.25</strong>  
*In a study of three sites in Ontario, STEP found the annual ''C<sub>vol, A</sub>'' of the rooftops to be around 0.8 [http://www.sustainabletechnologies.ca/wp/home/urban-runoff-green-infrastructure/low-impact-development/rainwater-harvesting/performance-evaluation-of-rainwater-harvesting-systems-toronto-ontario/]. This figure includes losses to evaporation, snow being blown off the roof, and a number of overflow events.
<br>D<sub>0.05</sub> = Five percent of the average annual demand (L)
<br>P<sub>d</sub> = The daily demand per person (L)
<br>n = The number of occupants
<br>Good catchment selection means that the runoff coefficient (C<sub>vol</sub>) should be 0.9 or greater. Filter efficiency (e) can be reasonably estimated as 0.9 pending manufacturer’s information.</p>
----
----
<p>Then the following calculations are based upon two criteria:
Five percent of the average annual demand can be estimated:
    <ol>
<math>D_{0.05} = P_{d} \times n\times 18.25</math>
        <li>A design rainfall depth is to be captured entirely by the RWH system.</li>
{{plainlist|Where:
        <li>The average annual demand (D) is greater than the average annual yield (Y) from the catchment. </li>
*''D<sub>0.05</sub>'' is five percent of the average annual demand (L)
    </ol>
*''P<sub>d</sub>'' is the daily demand per person (L)
</p>
*''n'' is the number of occupants}}
<p>When Y<sub>0.05</sub>/ D<sub>0.05</sub> < 0.33, the storage volume required (V<sub>S</sub>, in L) can be estimated:<br>
<strong>V<sub>S</sub> = A × C<sub>vol</sub> × R<sub>d</sub> × e</strong><br>
<br>V<sub>S</sub> = Storage volume required (L)  
<br>A = The catchment area (m<sup>2</sup>)
<br>C<sub>vol</sub> = The design storm runoff coefficient for the catchment
<br>R<sub>d</sub> = The design storm rainfall depth (mm), and
<br>e = The efficiency of the pre-storage filter.
</p>
<p>When 0.33 < Y<sub>0.05</sub>/ D<sub>0.05</sub> < 0.7, the total storage required can be estimated by adding Y<sub>0.05</sub>: <br>
<strong>Total storage = V<sub>S</sub> + Y<sub>0.05</sub></strong>
</p>
----
----
</div>
Then the following calculations are based upon two criteria:
<div class="col-md-4">
# A design rainfall depth is to be captured entirely by the RWH system.
<panelInfo>
# The average annual demand (''D'') is greater than the average annual yield (''Y'') from the catchment.
<gallery mode="packed" widths=300px heights=300px>
When \(Y_{0.05}/D_{0.05}<0.33\), the storage volume required can be estimated:
Cistern Size.png| Schematic diagram of the inputs and outputs to a rainwater harvesting cistern
<math>V_{S} = A_{c} \times C_{vol,E}\times R_{d} \times e</math>
</gallery>
{{plainlist|Where:
</panelInfo>
*''V<sub>S</sub>'' is the volume of storage required (L)
</div>
*''A<sub>c</sub>'' is the catchment area (m<sup>2</sup>)
<div class="col-md-12">
*''C<sub>vol,E</sub>'' is the design storm runoff coefficient for the catchment
*''R<sub>d</sub>'' is the design storm rainfall depth (mm), and
*''e'' is the efficiency of the pre-storage filter.}}


===STEP Rainwater Harvesting Tool===
*Careful catchment selection means that the runoff coefficient, for an individual rainstorm event (''C<sub>vol, E</sub>'') should be 0.9 or greater.
</div>
----       
<div class="col-md-8">
Finally, when \(0.33<Y_{0.05}/D_{0.05}<0.7\), the total storage required can be estimated by adding ''Y<sub>0.05</sub>'':
<p>The Sustainable Technologies Evaluation Program have produced a rainwater harvesting design and costing tool specific to Ontario. The tool is in a simple to use Excel format and is free to download.</p>
<math>TotalStorage = V_{S} + Y_{0.05}</math>
</div>
<div class="col-md-2">
<panelWarning>
[[File:Connect the Drops.PNG|200 px|STEP Rainwater Harvesting Tool|link=http://www.sustainabletechnologies.ca/wp/home/urban-runoff-green-infrastructure/low-impact-development/rainwater-harvesting/rainwater-harvesting-design-and-costing-tool/]]
</panelWarning>
</div>
<div class="col-md-12">
----
----
==STEP Rainwater Harvesting Tool==
[[File:RWH_tank_capacity_table.jpg|thumb|500 px|Quick reference table generated using STEP RWH tool, (data for the City of Toronto (median annual rainfall 678 mm). Optimal cistern size is that providing at least a 2.5% improvement in water savings following an increase of 1,000 Litres in storage capacity.]]
The Sustainable Technologies Evaluation Program have produced a rainwater harvesting design and costing tool specific to Ontario. The tool is in a simple to use Excel format and is free to download.<br>
{{clickable button|[[File:Connect the Drops.PNG|200 px|link=http://www.sustainabletechnologies.ca/wp/home/urban-runoff-green-infrastructure/low-impact-development/rainwater-harvesting/rainwater-harvesting-design-and-costing-tool/]]}}


===The Treatment Train Tool===
==STEP Treatment Train Tool==
</div>
{{Clickable button|[[File:TTT.png|300 px|link=http://www.sustainabletechnologies.ca/wp/low-impact-development-treatment-train-tool/]]}}<br>
<div class="col-md-8">
'''[[Rainwater harvesting: TTT]]'''
<p> Once the size of cistern has been determined, it can easily be modelled in many open source and proprietary applications. </p>
<p> In addition to the cistern size, this watershed scale modelling requires input information about draw down. time i.e. the rate of use. </p>
</div>
<div class="col-md-4">
<btnPrimary>The Treatment Train Tool</btnPrimary>
</div>
<div class="col-md-12">


----
==Cistern dimensions==
{{:Feedback}}
[[File:Cistern dimensions.jpg|thumb|The blue area indicates the only usable volume in this rainwater harvesting cistern, the depth between the pump inlet and the overflow.]]
The connections into and out of a rainwater cistern can have a dramatic effect on the actual usable volume. The only usable water within the cistern is that above the height of the pump intake, and below the invert of the overflow outlet. This dimension can easily become constrained where the outlet must lie beneath the frost line and where a high powered pump is required to elevate the water many storeys.
* The depth of storage between the elevation of the inlet and overflow is unusable space, so the overflow should be located towards the top of the cistern.
* The depth of storage beneath the pump inlet is unusable, but may also be a useful zone for sediment to settle. A custom or cast-in-place vault could minimise this unused volume by tapering towards the the base. 
[[category:modeling]]
[[category:modeling]]

Navigation menu