Difference between revisions of "Rainwater harvesting: Sizing and modeling"
Jump to navigation
Jump to search
Jenny Hill (talk | contribs) |
Jenny Hill (talk | contribs) |
||
Line 3: | Line 3: | ||
===Sizing Tool=== | ===Interactive Sizing Tool=== | ||
Sustainable Technologies have produced a rainwater harvesting design and costing tool specific to Ontario[http://www.sustainabletechnologies.ca/wp/home/urban-runoff-green-infrastructure/low-impact-development/rainwater-harvesting/rainwater-harvesting-design-and-costing-tool/] | <p>The Sustainable Technologies Evaluation Program have produced a rainwater harvesting design and costing tool specific to Ontario. The tool is in a simple to use Excel format and is free to download. </p> | ||
<panelInfo> | |||
[http://www.sustainabletechnologies.ca/wp/home/urban-runoff-green-infrastructure/low-impact-development/rainwater-harvesting/rainwater-harvesting-design-and-costing-tool/ RWH Sizing Tool] | |||
</panelInfo> | |||
===The Treatment Train Tool=== | ===The Treatment Train Tool=== | ||
<btnPrimary>The Treatment Train Tool</btnPrimary> | <btnPrimary>The Treatment Train Tool</btnPrimary> |
Revision as of 18:21, 2 June 2017
Rapid[edit]
Cistern size can be estimated by multiplying the depth
Interactive Sizing Tool[edit]
The Sustainable Technologies Evaluation Program have produced a rainwater harvesting design and costing tool specific to Ontario. The tool is in a simple to use Excel format and is free to download.
<panelInfo> RWH Sizing Tool </panelInfo>
The Treatment Train Tool[edit]
<btnPrimary>The Treatment Train Tool</btnPrimary>