Changes

Jump to navigation Jump to search
m
no edit summary
Line 10: Line 10:
''Do the units check out for calculating the total depth of the stone reservoir? (i.e. should f' be in units of m/hr instead of m/day?)''
''Do the units check out for calculating the total depth of the stone reservoir? (i.e. should f' be in units of m/hr instead of m/day?)''
*The [[notation]] used in the equations on [[Permeable paving: Sizing]] is being brought into line with the other sections of the site. Units have also been checked and brought into line to millimeters and hours as used for the other BMPs.
*The [[notation]] used in the equations on [[Permeable paving: Sizing]] is being brought into line with the other sections of the site. Units have also been checked and brought into line to millimeters and hours as used for the other BMPs.
'''11 June 2018'''
''The term "forebay" has a strong industry connection to SWM ponds, should this page have a different/more specific name?''
*"Forebay" now redirects to the newly named [[Pretreatment features]] page as you suggest.


'''24 April 2018'''  
'''24 April 2018'''  

Navigation menu