Difference between revisions of "Rainwater harvesting: Sizing and modeling"
Jump to navigation
Jump to search
Jenny Hill (talk | contribs) |
Jenny Hill (talk | contribs) |
||
Line 21: | Line 21: | ||
<btnInfo>[[File:Connect the Drops.PNG|link=http://www.sustainabletechnologies.ca/wp/home/urban-runoff-green-infrastructure/low-impact-development/rainwater-harvesting/rainwater-harvesting-design-and-costing-tool/]]</btnInfo> | <btnInfo>[[File:Connect the Drops.PNG|link=http://www.sustainabletechnologies.ca/wp/home/urban-runoff-green-infrastructure/low-impact-development/rainwater-harvesting/rainwater-harvesting-design-and-costing-tool/]]</btnInfo> | ||
<button type="button" class="btn btn-outline-primary">Primary</button> | |||
</div> | </div> |
Revision as of 20:36, 5 June 2017
Rapid[edit]
Total cistern volume can be estimated by multiplying the depth of design storm....
<panelInfo>
</panelInfo>
STEP RWH tool[edit]
The Sustainable Technologies Evaluation Program have produced a rainwater harvesting design and costing tool specific to Ontario. The tool is in a simple to use Excel format and is free to download.
The Treatment Train Tool[edit]
Once the size of cistern has been determined, it can easily be modelled in many open source and proprietary applications.
In addition to the cistern size, modelling requires
<btnPrimary>The Treatment Train Tool</btnPrimary>