Difference between revisions of "LEED: Rainwater management"

From LID SWM Planning and Design Guide
Jump to navigation Jump to search
m (Jenny Hill moved page LEED Rainwater management to LEED: Rainwater management: Consi)
m
 
(One intermediate revision by the same user not shown)
Line 1: Line 1:
<strong>Water Efficiency: Rainwater management  (up to 3 points)</strong><br>
<poem>
[https://www.usgbc.org/node/2764291?return=/credits/new-construction/v4/sustainable-sites '''Sustainable sites: Rainwater management  (up to 3 points)''']
*Two points (or 1 point for Healthcare) will be awarded if the project manages "the runoff from the developed site for the 95th percentile of regional or local rainfall events."
*Two points (or 1 point for Healthcare) will be awarded if the project manages "the runoff from the developed site for the 95th percentile of regional or local rainfall events."
*Three points (or 2 points for Healthcare) will be awarded if the project manages "the runoff from the developed site for the 98th percentile of regional or local rainfall events."
*Three points (or 2 points for Healthcare) will be awarded if the project manages "the runoff from the developed site for the 98th percentile of regional or local rainfall events."
<strong>OR</strong><br>
'''OR'''
*For zero-lot-line projects only, 3 points (or 2 points for Healthcare) will be awarded if the project manages "the runoff from the developed site for the 85th percentile of regional or local rainfall events."
*For zero-lot-line projects only, 3 points (or 2 points for Healthcare) will be awarded if the project manages "the runoff from the developed site for the 85th percentile of regional or local rainfall events."
</poem>

Latest revision as of 02:14, 9 November 2017

Sustainable sites: Rainwater management (up to 3 points)

  • Two points (or 1 point for Healthcare) will be awarded if the project manages "the runoff from the developed site for the 95th percentile of regional or local rainfall events."
  • Three points (or 2 points for Healthcare) will be awarded if the project manages "the runoff from the developed site for the 98th percentile of regional or local rainfall events."

OR

  • For zero-lot-line projects only, 3 points (or 2 points for Healthcare) will be awarded if the project manages "the runoff from the developed site for the 85th percentile of regional or local rainfall events."