Difference between revisions of "Bioretention: Construction checklist"
Jump to navigation
Jump to search
Jenny Hill (talk | contribs) |
Jenny Hill (talk | contribs) |
||
(6 intermediate revisions by the same user not shown) | |||
Line 4: | Line 4: | ||
!colspan =2|Erosion and Sediment Control | !colspan =2|Erosion and Sediment Control | ||
|- | |- | ||
|style="width: | |style="width:30px"| | ||
|Bioretention locations should be blocked from construction traffic and should not be used for erosion and sediment control | |Bioretention locations should be blocked from construction traffic and should not be used for erosion and sediment control | ||
|- | |- | ||
|| | || | ||
|Proper erosion and sediment controls should be in place for the drainage area | |Proper erosion and sediment controls should be in place for the drainage area | ||
|- | |||
!colspan =2|Materials | |||
|- | |||
|style="width:30px"| | |||
|Gravel for the underdrain should be clean and washed; no fines should be present in the material | |||
|- | |||
|| | |||
|Underdrain pipe material should be perforated and of the correct size (when specified in design) | |||
|- | |||
|| | |||
|A cap should be placed on the upstream (but not the downstream) end of the underdrain (when specified in design) | |||
|- | |||
|| | |||
|Biomedia should be tested to confirm that it meets specifications | |||
|- | |||
|| | |||
|Mulch composition should be correct | |||
|- | |||
!colspan =2|Elevations | |||
|- | |||
|style="width:30px"| | |||
|Depth of the gravel and invert of the underdrain | |||
|- | |||
|| | |||
|Inverts for inflow and outflow points | |||
|- | |||
|| | |||
|Filter media depth | |||
|- | |||
|| | |||
|Ponding depth provided between the surface of the filter bed and the overflow structure | |||
|- | |||
|| | |||
|Mulch depth | |||
|- | |||
!colspan =2|Landscaping and Stabilization | |||
|- | |||
|style="width:30px"| | |||
|Correct vegetation should be planted | |||
|- | |||
|| | |||
|Pretreatment area should be stabilized | |||
|- | |||
|| | |||
|Drainage area should be stabilized prior to directing water to the bioretention | |||
|- | |||
!colspan =2|The following items should be checked after the first rainfall event, and adjustments should be made as necessary: | |||
|- | |||
|style="width:30px"| | |||
|Outfall protection/energy dissipation at concentrated inflow should be stable | |||
|- | |||
|| | |||
|Flow should not concentrate and should spread evenly over the filter bed | |||
|- | |||
|| | |||
|Ponded water at the surface of the bioretenton facility must drain within 24 hours of the end of the storm event. <br> The biomedia should fully drain within a maximum period of 72 hours | |||
|- | |||
|| | |||
|Excessive sediment accumulation should not be present | |||
|} | |} | ||
[[category:Checklists]] | [[category:Checklists]] | ||
[[category:Construction]] | [[category:Construction]] |
Latest revision as of 00:08, 5 September 2017
Common construction pitfalls can be avoided with careful construction supervision that focuses on the following aspects:
Erosion and Sediment Control | |
---|---|
Bioretention locations should be blocked from construction traffic and should not be used for erosion and sediment control | |
Proper erosion and sediment controls should be in place for the drainage area | |
Materials | |
Gravel for the underdrain should be clean and washed; no fines should be present in the material | |
Underdrain pipe material should be perforated and of the correct size (when specified in design) | |
A cap should be placed on the upstream (but not the downstream) end of the underdrain (when specified in design) | |
Biomedia should be tested to confirm that it meets specifications | |
Mulch composition should be correct | |
Elevations | |
Depth of the gravel and invert of the underdrain | |
Inverts for inflow and outflow points | |
Filter media depth | |
Ponding depth provided between the surface of the filter bed and the overflow structure | |
Mulch depth | |
Landscaping and Stabilization | |
Correct vegetation should be planted | |
Pretreatment area should be stabilized | |
Drainage area should be stabilized prior to directing water to the bioretention | |
The following items should be checked after the first rainfall event, and adjustments should be made as necessary: | |
Outfall protection/energy dissipation at concentrated inflow should be stable | |
Flow should not concentrate and should spread evenly over the filter bed | |
Ponded water at the surface of the bioretenton facility must drain within 24 hours of the end of the storm event. The biomedia should fully drain within a maximum period of 72 hours | |
Excessive sediment accumulation should not be present |