Difference between revisions of "LEED: Rainwater management"

From LID SWM Planning and Design Guide
Jump to navigation Jump to search
m
m
 
Line 1: Line 1:
<poem>
<poem>
[https://www.usgbc.org/node/2764291?return=/credits/new-construction/v4/sustainable-sites Sustainable sites: Rainwater management  (up to 3 points)''']
[https://www.usgbc.org/node/2764291?return=/credits/new-construction/v4/sustainable-sites '''Sustainable sites: Rainwater management  (up to 3 points)''']
*Two points (or 1 point for Healthcare) will be awarded if the project manages "the runoff from the developed site for the 95th percentile of regional or local rainfall events."
*Two points (or 1 point for Healthcare) will be awarded if the project manages "the runoff from the developed site for the 95th percentile of regional or local rainfall events."
*Three points (or 2 points for Healthcare) will be awarded if the project manages "the runoff from the developed site for the 98th percentile of regional or local rainfall events."
*Three points (or 2 points for Healthcare) will be awarded if the project manages "the runoff from the developed site for the 98th percentile of regional or local rainfall events."

Latest revision as of 02:14, 9 November 2017

Sustainable sites: Rainwater management (up to 3 points)

  • Two points (or 1 point for Healthcare) will be awarded if the project manages "the runoff from the developed site for the 95th percentile of regional or local rainfall events."
  • Three points (or 2 points for Healthcare) will be awarded if the project manages "the runoff from the developed site for the 98th percentile of regional or local rainfall events."

OR

  • For zero-lot-line projects only, 3 points (or 2 points for Healthcare) will be awarded if the project manages "the runoff from the developed site for the 85th percentile of regional or local rainfall events."