Difference between revisions of "Jar test"

From LID SWM Planning and Design Guide
Jump to navigation Jump to search
m
m
 
(3 intermediate revisions by the same user not shown)
Line 2: Line 2:
Specifying that [[aggregates]] for the construction of LID practices must be free from fines is important.  
Specifying that [[aggregates]] for the construction of LID practices must be free from fines is important.  
But checking that the delivered materials meet specification is essential to reduce problems with construction and longer term performance.   
But checking that the delivered materials meet specification is essential to reduce problems with construction and longer term performance.   
When possible, Construction Managers should observe the offloading of materials to watch for dust clouds. Aggregates or [[sand]] for LID construction should not give rise to clouds of dust when dumped.  
When possible, Construction Managers should observe the offloading of materials to watch for dust clouds. Aggregates or [[sand]] for LID construction should not give rise to clouds of dust when dumped.  


A simple jar test can be used to gauge the proportion of fines in an aggregate product before acceptance.   
A simple jar test can be used to gauge the proportion of fines in an aggregate product before acceptance.   
Apparatus:  
Apparatus:  
*A large wide-mouthed jar - glass or clear plastic are both fine.
*A large wide-mouthed jar - glass or clear plastic are both fine,
*Tap water, and
*Tap water, and
*The aggregate to be tested.
*The aggregate to be tested.
Method:
Method:
# Collect approximately 5 cm of material in the jar (or at least two complete layers of 40 mm clear stone),  
# Collect approximately 5 cm of material in the jar (or at least two complete layers of 50 mm clear stone),  
# Add water to around 3/4 full,
# Add water to around 3/4 full,
# Secure cap and shake,  
# Secure cap and shake,  
# Leave for at least 30 minutes until the water is clear - longer is better, so overnight when possible,
# Leave for at least 30 minutes and until the water is clear - plan to run the test overnight when possible,
# Examine the layer of sediment - if > 3 mm has been washed from 5 cm of product, reject the material,
# Examine the layer of sediment - if > 3 mm has been washed from 5 cm of product, the material should be rejected,
Note that the sediment may collect on top of, or at the bottom of the construction material.  
Note that the sediment may collect on top of, or at the bottom of the construction material.  


==External references==
==External references==
*Heger, S. (2014). Critical Aspects During System Installation and Inspection General equipment considerations. In PMSA conference. Retrieved from http://www.psma.net/pdf/14/conference-presentations/Keys_to_Installation_(Heger).pdf
*Heger, S. (2014). Critical Aspects During System Installation and Inspection General equipment considerations. In PMSA conference. Retrieved from http://www.psma.net/pdf/14/conference-presentations/Keys_to_Installation_(Heger).pdf
*Manitoba. (2010). Onsite Wastewater Management Systems: Field Reference Guide - JAR TEST. Retrieved from http://www.gov.mb.ca/sd/envprograms/wastewater/pdf/jar_test_reference_03_2010.pdf

Latest revision as of 15:57, 13 June 2018

Steps in conducting a jar test to detect fines in construction materials

Specifying that aggregates for the construction of LID practices must be free from fines is important. But checking that the delivered materials meet specification is essential to reduce problems with construction and longer term performance.

When possible, Construction Managers should observe the offloading of materials to watch for dust clouds. Aggregates or sand for LID construction should not give rise to clouds of dust when dumped.

A simple jar test can be used to gauge the proportion of fines in an aggregate product before acceptance.

Apparatus:

  • A large wide-mouthed jar - glass or clear plastic are both fine,
  • Tap water, and
  • The aggregate to be tested.

Method:

  1. Collect approximately 5 cm of material in the jar (or at least two complete layers of 50 mm clear stone),
  2. Add water to around 3/4 full,
  3. Secure cap and shake,
  4. Leave for at least 30 minutes and until the water is clear - plan to run the test overnight when possible,
  5. Examine the layer of sediment - if > 3 mm has been washed from 5 cm of product, the material should be rejected,

Note that the sediment may collect on top of, or at the bottom of the construction material.

External references[edit]