Changes

Jump to navigation Jump to search
m
no edit summary
Line 6: Line 6:
*The overflow must be situated at the far end of the facility to prevent any localised ponding to cause bypassing of the infiltration facility.  
*The overflow must be situated at the far end of the facility to prevent any localised ponding to cause bypassing of the infiltration facility.  
*Offline facilities use flow splitters or bypass channels that only allow the required water quality storage volume to enter the facility.  
*Offline facilities use flow splitters or bypass channels that only allow the required water quality storage volume to enter the facility.  
:Higher flows are diverted and do not enter the infiltration practice. A pipe can by used for this, but a weir or [[curb cuts|curb cut]] minimizes clogging and reduces the maintenance frequency.
:Higher flows are diverted and do not enter the infiltration practice. A pipe can by used for this, but a [[weir]] or [[curb cuts|curb cut]] minimizes clogging and reduces the maintenance frequency.


===Overflow elevation===
===Overflow elevation===

Navigation menu