Difference between revisions of "Main Page"

From LID SWM Planning and Design Guide
Jump to navigation Jump to search
Line 26: Line 26:
           <div class="carousel-inner">
           <div class="carousel-inner">
             <div class="item">
             <div class="item">
<div class="col-md-12">
               <div class="">https://lydiafmartinblog.files.wordpress.com/2013/09/img_4247.jpg</div>
               <div class="">https://lydiafmartinblog.files.wordpress.com/2013/09/img_4247.jpg</div>
               <div class="carousel-caption">
               <div class="col-md-12"><div class="carousel-caption">
                 <h4>First Thumbnail label</h4>
                 <h4>First Thumbnail label</h4>
                 <p>Cras justo odio, dapibus ac facilisis in, egestas eget quam. Donec id elit non mi porta gravida at
                 <p>Cras justo odio, dapibus ac facilisis in, egestas eget quam. Donec id elit non mi porta gravida at

Revision as of 17:49, 15 December 2016

    ◀︎
    ▶︎
  • orbit_1.jpg

    Bootstrapskin 2.0

    Our most popular skin, only better! With a new range of custom plugins aimed at wiki communities.

  • orbit_2.jpg

    Android Ready

    2.0 includes an Android app that includes latest news & Mediawiki New Articles

  • orbit_3.jpg

    Enterprise

    Enterprise level Mediawiki solutions from Anthom.


Welcome to the Low Impact Development Stormwater Management Practice Planning and Design Guide

This website was developed using Mediawiki, a wiki application that allows for easy editing and that has powerful search abilities. See Introduction to the wiki for more information.

The Low Impact Development Stormwater Management Planning and Design Guide (LID SWM Guide) has been developed by Credit Valley Conservation (CVC) and Toronto and Region Conservation Authority (TRCA) as a tool to help developers, consultants, municipalities and landowners understand and implement more sustainable stormwater management planning and design practices in their watersheds. Many jurisdictions have defined the term low impact development. For this document, the following definition, adapted from the United States Environmental Protection Agency (U.S. EPA, 2007) will be used:

Low impact development (LID) is a stormwater management strategy that seeks to mitigate the impacts of increased runoff and stormwater pollution by managing runoff as close to its source as possible. LID comprises a set of site design strategies that minimize runoff and distributed, small scale structural practices that mimic natural or predevelopment hydrology through the processes of infiltration, evapotranspiration, harvesting, filtration and detention of stormwater. These practices can effectively remove nutrients, pathogens and metals from runoff, and they reduce the volume and intensity of stormwater flows.

<btnPrimary>Read more ..</btnPrimary>

750x500.jpg

INTRODUCTION TO THE LOW IMPACT DEVELOPMENT PLANNING AND DESIGN GUIDE

INTEGRATING STORMWATER MANAGEMENT INTO THE PLANNING PROCESS

THE LOW IMPACT DEVELOPMENT APPROACH

DESIGN OF STRUCTURAL LOW IMPACT DEVELOPMENT PRACTICES FOR STORMWATER MANAGEMENT

MONITORING

TOOLS

<h4Blue>Introduction to the LID Planning and Design Guide</h4Blue>

Lorem ipsum dolor sit amet, consectetur adipiscing dolor sit amet e.

<btnPrimary>Read more ...</btnPrimary>

<h4Blue>Integrating Stormwater Management into the Planning Process</h4Blue>

Lorem ipsum dolor sit amet, consectetur adipiscing dolor sit amet e.

<btnPrimary>Read more ..</btnPrimary>

<h4Blue>The LID Approach</h4Blue>

Lorem ipsum dolor sit amet, consectetur adipiscing dolor sit amet e.

<btnPrimary>Read more ..</btnPrimary>

<h4Blue>Design of Structural LID Practices for Stormwater Management</h4Blue>

Lorem ipsum dolor sit amet, consectetur adipiscing dolor sit amet e.

<btnPrimary>Read more ..</btnPrimary>

<h4Blue>Monitoring of LID Practices</h4Blue>

Lorem ipsum dolor sit amet, consectetur adipiscing dolor sit amet e.

<btnPrimary>Read more ..</btnPrimary>

<h4Blue>Tools</h4Blue>

Lorem ipsum dolor sit amet, consectetur adipiscing dolor sit amet e.

<btnPrimary>Read more ..</btnPrimary>

Recent projects

550x550.jpg
anthom_home_7.jpg

Thumbnail label

Cras justo odio, dapibus ac facilisis in, egestas eget quam. Donec id elit non mi porta gravida at eget metus. Nullam id dolor id nibh ultricies vehicula ut id elit.

550x550.jpg
550x550.jpg
550x550.jpg
550x550.jpg
550x550.jpg
550x550.jpg
550x550.jpg
550x550.jpg
550x550.jpg

Special:SpecialContact