Difference between revisions of "LID Construction"

From LID SWM Planning and Design Guide
Jump to navigation Jump to search
Line 31: Line 31:


{{Clickable button|[[Stormwater Planters: Construction]]}}
{{Clickable button|[[Stormwater Planters: Construction]]}}
=LID Pages=
*[[Bioretention]]
*[[Bioswales]]
*[[Blue roofs]]
*[[Enhanced swales]]
*[[Exfiltration trenches]]
*[[Green roofs]]
*[[Infiltration chambers]]
*[[Infiltration trenches]]
*[[Permeable pavements]]
*[[Rain gardens]]
*[[Stormwater planters]]
*[[Stormwater Tree Trenches]]
*[[Swales]]
*[[Vegetated filter strips]]

Revision as of 19:45, 11 February 2022

Why is construction different?[edit]

Why problems occur?[edit]

Phases of LID Construction[edit]

1. Pre-Construction:

  • Verification of design
  • Tendering and contract
  • Pre-construction inspection and protocols
  • Mobilizing, access and perimeter controls
  • Erosion and Sediment Control (ESC)

2. Construction:

  • Excavation and mass grading
  • Backfill granular and pipes
  • Finish grades: inlet, outlet, biomedia and plants

3. Post-Construction:

  • Address deficiencies
  • Assumption protocols

Why is inspection important for LID Construction?[edit]

Construction Guidance[edit]

Bioretention: Construction Swales: Construction

Permeable Pavements: Construction

Blue Roofs: Construction Green Roofs: Construction 

Stormwater Planters: Construction