Line 26:
Line 26:
===Notes===
===Notes===
* Operation and maintenance cost estimates assume replacement of severely degraded/failing pavers after the first 8 years of operation.
* Operation and maintenance cost estimates include replacement of joint stabilizing aggregate material removed by vacuum sweeping.
* The tool calculates costs for new (greenfield) development contexts and includes costs for contractor overhead and profit, material, delivery, labour, equipment (rental, operating and operator costs), hauling and disposal.
* The tool calculates costs for new (greenfield) development contexts and includes costs for contractor overhead and profit, material, delivery, labour, equipment (rental, operating and operator costs), hauling and disposal.
** Land value and equipment mobilization and demobilization costs are not included, assuming BMP construction is part of overall development site construction.
** Land value and equipment mobilization and demobilization costs are not included, assuming BMP construction is part of overall development site construction.