Difference between revisions of "Curb cuts"
Jump to navigation
Jump to search
Jenny Hill (talk | contribs) (Created page with "<gallery mode="packed" widths=300px heights=300px> Curb cut CNT.jpg| Curb cut into a bioretention facility in Hinsdale, IL. Decorative aggregate in the center of the facility...") |
Jenny Hill (talk | contribs) |
||
Line 1: | Line 1: | ||
<gallery mode="packed" widths=300px heights=300px> | <gallery mode="packed" widths=300px heights=300px> | ||
Curb cut CNT.jpg| Curb cut into a bioretention facility in Hinsdale, IL. Decorative aggregate in the center of the facility reduces erosion and dissipates power inflow around the inlet area. A monitoring/maintenance well can be seen in the foreground. [ | Curb cut CNT.jpg| Curb cut into a bioretention facility in Hinsdale, IL. <br>Decorative aggregate in the center of the facility reduces erosion and dissipates power inflow around the inlet area. A monitoring/maintenance well can be seen in the foreground. <br>[[Acknowledgements| Photo credit: CNT]] | ||
Curb cut AV.jpg | Curb cut into a bioretention facility in Brown Deer, WI. <br>Aggregate is used to reduce erosion around the inlet area. [[Acknowledgements| Photo credit: Aaron Volkening]] | |||
</gallery> | </gallery> |
Revision as of 15:36, 12 July 2017
Curb cut into a bioretention facility in Hinsdale, IL.
Decorative aggregate in the center of the facility reduces erosion and dissipates power inflow around the inlet area. A monitoring/maintenance well can be seen in the foreground.
Photo credit: CNTCurb cut into a bioretention facility in Brown Deer, WI.
Aggregate is used to reduce erosion around the inlet area. Photo credit: Aaron Volkening