Difference between revisions of "Infiltration"

From LID SWM Planning and Design Guide
Jump to navigation Jump to search
Line 45: Line 45:
!style="background: darkcyan; color: white" colspan="3"|Consequence of failure
!style="background: darkcyan; color: white" colspan="3"|Consequence of failure
|-
|-
!No damage or inconvenience
!style="background: darkcyan; color: white"No damage or inconvenience
!Minor damage or inconvenience to external structures (e.g. ponding in parking lot)
!style="background: darkcyan; color: white"Minor damage or inconvenience to external structures (e.g. ponding in parking lot)
!Significant damage to buildings or infrastructure (e.g. flooding damage)
!style="background: darkcyan; color: white"Significant damage to buildings or infrastructure (e.g. flooding damage)
|-
|-
|<100 m<sup>2</sup>||1.5||2||10
|<100 m<sup>2</sup>||1.5||2||10

Revision as of 00:00, 15 August 2017

Infiltration of stormwater into underlying soils is one the priority level 1. mechanisms to achieve MOECC Runoff Volume Control targets. In many areas of Ontario, where municipal supplies of potable water are drawn from aquifers, it's also an important mechanism for groundwater recharge.

Infiltration is promoted through a number of LID BMPs:

Constraints[edit]

Infiltration practices are not recommended:

  1. over swelling clays or unstable sub-soils,
  2. over contaminated soils or sites with high risk of contamination from onsite activities,
  3. in flood prone areas where the wastewater system is sensitive to groundwater conditions causing sewer backups, and where LID BMPs have been found to be ineffective,
  4. in areas where the ecology and natural hydrology are dependent upon surface water,
  5. in areas where increased infiltration will result in elevated groundwater levels, which can be demonstrated to damage critical utilities or private property, or
  6. where prohibitions and/or restrictions exist per approved Source Protection Plans (see MOECC guidance).


Infiltration facilities should be designed with drainage modifications where:

  1. the underlying bedrock is within 1 m below the bottom of the proposed BMP, or
  2. the seasonal high groundwater level comes within 1 m below the bottom of the proposed BMP.

Designing with constraints[edit]

Infiltration can still be optimized over 'tight' soils with infiltration rates ≤ 15 mm/hr:

Where infiltration is impossible, LID design alternatives exist which can still capture and retain stormwater:

Planning[edit]

NEW CONTENT HERE?

Soil infiltration rate

Infiltration tests must be undertaken at the location, depth and with a head of water that replicates the proposed design.

Suggested safety factors to be applied to measured percolation rate when designing infiltration facilities
Catchment area Consequence of failure
style="background: darkcyan; color: white"No damage or inconvenience style="background: darkcyan; color: white"Minor damage or inconvenience to external structures (e.g. ponding in parking lot) style="background: darkcyan; color: white"Significant damage to buildings or infrastructure (e.g. flooding damage)
<100 m2 1.5 2 10
100 - 1000 m2 1.5 3 10
Suggested safety factors to be applied to measured percolation rate when designing infiltration facilities
Catchment area Consequence of failure
No damage or inconvenience Minor damage or inconvenience to external structures (e.g. ponding in parking lot) Significant damage to buildings or infrastructure (e.g. flooding damage)
<100 m2 1.5 2 10
100 - 1000 m2 1.5 3 10